
The area of intervention is what remains of what was previously the sports hall of the municipal pavilion. In the snow storm of the year 2016, the roof of the track collapsed, with what today there is a floor on the ground floor with beams propped on the first floor.
The intervention covers only a part of what was the sports track, linked to the Carmen Conde C. The rest of the building includes changing rooms, offices, swimming pool and other rooms of use linked to it.


